Industrial real estate for lease inside Hi-Park SEZ, Bavet, Cambodia.
Hi-Park SEZ offers over 400 hecatres of land with road, electrical and water infrastructure as part of a Special Economic Zone (SEZ) in Bavet. Located along the main road and very close to the border with Vietnam the SEZ is ideal for industrial and manufacturing requirements.
- Charges on Net building area
- Build to suit option available
- Future development of hotel, green communal areas, swimming pool
- Good flood prevention / drainage
- Infrastructure Maintenance Fee: $0.05 per sq.m
- Electricity Fee: $0.137 per kwh
- Min Lease Term: 3 years
- Infrastructure Maintenance Fee: $0.05 per sq.m
- Electricity Fee: $0.137 per kwh
- Sewage Treatment Fee: $0.52 per m3
This Special Economic Zone is strategically located on National Highway 1 and very close to the border with Vietnam.
For more information on Hi-Park SEZ please contact Knight Frank Cambodia.
.jpg)
Hi-Park SEZ Key Facts
| Project Name |
Hi-Park SEZ |
| Address |
Chipu Cheat, Bavet City, Svay Rieng Province, Cambodia |
| Lease Type |
Long Term Lease |
| Year Opening |
2013 |
| Developed by |
Hi-Park Land & Property Co., Ltd |
| Total Land area in SEZ |
400 ha |
| No. of main entrance |
1 |
| Road Access Size (m) |
22m main road, 50m including garden both side |
| Current tenants industrial type |
MUTLIGHT, GRANDY, HP |
| Occupancy |
30% |
| Type of Property available |
Building & Land Plot |
| Net Size available (m2) |
Building (from 16,000m2) Land (from 10,000m2) |
| Handover condition |
Concrete hardscape |
| Ceiling Height (m) |
8.5m |
| Floor Type |
Concrete |
| Staff Dormitory |
Yes |
| Container truck parking area |
On site of each industrial |
| Loading area |
The developer will do the loading dock |
| 24h Security guard |
Yes |
| Internet provider |
Yes (tenant will be responsible for connection) |
| Backup generator |
Yes |
| Water System |
Well water |
| QIP |
Yes |
| Floor Plan |
Yes |
| Type of title |
Hard title 50yrs return |
| Infrastructure Maintenance Fee |
$0.05 per sq.m |
| Electricity Fee |
$0.137 per kwh |
| Water Fee |
Included |
| Sewage Treatment Fee |
Free of charge for now |
| Minimum Lease |
3 years |
.jpg)